What are the Pros and Cons of Longer Solar Contracts?
The first-ever 35-year solar power contract – ACWA Power’s with DEWA in Dubai – had a record-low price, for CSP+storage of just 7.3 cents per kWh. Did a longer contract enable the record low price?
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed