Chile

Latest Online: 2022 Cerro Dominador 110 MW SolarPACES-NREL database: All plant details on the 110 MW Cerro Dominador tower CSP project The 110 MW Cerro Dominador tower CSP project with 17.5 hours of thermal energy storage first synchronized to the grid in 2021 and was online in 2022. The initial developer was Abengoa, a multinational … Continue reading Chile