Home » SolarPACES Tasks » TASK I: Solar Thermal Electric Systems

TASK I: Solar Thermal Electric Systems

Operating Agent:

Mike Wagner, University of Wisconsin, USA

Published Task Reports

Full paper (pdf): SolarPACES Guideline for Bankable STE Yield Assessment Version 2017
Full paper (pdf) Utility-Scale Parabolic Trough Solar Systems: Performance Acceptance Test Guidelines
Full paper (pdf) Utility-Scale Power Tower Systems: Performance Acceptance Test Guidelines

Task reports – review stage

The following report is currently open to comments. Please send suggestions edits to: secretariat@solarpaces.org

Task I Model Intercomparison and Case Studies Concerning Hybrid CSP-TES-PV-Battery Systems

The creation of this deliverable has been funded by SolarPACES within the Task I group. The funded project was entitled “Model Intercomparison and Case Studies Concerning Hybrid CSP-TES/PV-Battery Systems” and was carried out from February 2023 to September 2024. The funded institutes were DLR (Germany), Politecnico di Milano (Italy), KTH Royal Institute of Technology (Sweden), and National Renewable Energy Laboratory (United States of America). The National Renewable Energy Laboratory partnered with Colorado School of Mines to complete this work. Input data and detailed results for the case studies conducted within this report are available at https://data.openei.org/submissions/8322.

Subtasks and Working Groups

Particle Technology Working Group (PTWG)

Nature of Work & Objectives

Task I addresses the design, testing, demonstration, evaluation, and application of concentrating solar power systems, also known as solar thermal electric systems. This includes parabolic troughs, linear Fresnel collectors, power towers and dish/engine systems.  Through technology development and market barrier removal, the focus of SolarPACES Task I is enabling the entry of CSP systems into the commercial market place.  The component development and research efforts of Task III logically feed Task I as new components become parts of new systems.  In return, the results of this Task I provide direction to Task III on new component needs.

Organization and structure

The Task I Operating Agent is responsible for organization and reporting of Task I activities. Due to the desire of CSP developers and other stakeholders to promote and increase the financeability of CSP projects, Task I has focused on the following subtasks:

  • The development and population of an international project database for commercial CSP systems under operation, construction, or development. http://www.nrel.gov/csp/solarpaces
  • The development of acceptance test procedures and standards for CSP systems.
  • The development of a Guideline for Bankable STE Yield Assessment.
  • The value of CSP in electricity markets with variable energy sources.
  • Formation of an international Particle Technology Working Group (PTWG) to investigate high-temperature particle technologies for cross-cutting applications of power generation, storage, solar fuels, thermochemistry, and process heat.