China’s CSP projects online from 2012-2026, by Province:

QINGHAI

10MW Tower CSP+2.5 HRS TES, developed by Supcon Solar (now Cosin Solar), at Delingha, Qinghai (2013) NREL CSP Focus

50MW Trough CSP+9 HRS TES, developed by China General Nuclear Power (CGN), at Delingha, Qinghai (2018) NREL

50MW Tower CSP+7 HRS TES, developed by Supcon Solar (now Cosin Solar), at Delingha, Qinghai (2018) NREL

50MW Tower CSP+12 HRS TES, developed by Luneng Group, State Grid (SGCC), at Haixi, Qinghai (2019) NREL

50MW Tower CSP+6 HRS TES, developed by PowerChina, at Talatan Solar Park, Gonghe, Qinghai (2019) NREL

100MW Tower CSP+8 HRS TES developed by China Three Gorges Renewables (CTGR), Shouhang Hi-Tech, at 1.1GW Wutumeiren Solar Base (+1GW PV), Qinghai, connected to the Qingyu DC line (2025) SolarPACES  Shouhang 

100MW Tower CSP+TES developed by China Three Gorges Renewables (CTGR), Cosin Solar, Energy China ZTPC (at lot II)1GW Wutumeiren Solar Base (+900 MW PV), connected to the Qingyu DC line Qinghai Province (2025) NREL  CSTA  Cosin Connected CSTA 

100MW Tower CSP+12 HRS TES, developed by China Energy (CHN Energy) at Talatan Solar Park, Gonghe County, Qinghai (2025) Esplaza   Cosin Solar    SolarPACES/CSTA 

200MW Tower CSP+6 HRS TES, developed by CGN New Energy, Cosin Solar (Solar Field & MSR System), at Phase I: 1GW Solar Park, Keluke Town, Delingha City, Qinghai (under construction) CSTA   Cosin   CSTA

350MW Triple-Tower CSP+TES developed by Zhejiang Zhongguang New Energy Technology at SUPCON Solar Gen-3 Demo at Delingha, Qinghai (under construction 2026) CSTA

350MW Triple-Tower CSP+14 HRS TES, developed by Cosin Solar/Power China at 1.1GW Wutumeiren Solar Base, Golmud, Qinghai (under construction 2026) Cosin Solar   SolarPACES: Two 350MW Tower projects mark start of China’s Gen-3…  CGTN: World’s largest… Cosin 

GANSU

10MW Fresnel CSP+15 HRS TES, developed by Lanzhou Dacheng Technology, at Dunhuang, Gansu (2016) NREL

10MW Tower CSP+15 HRS TES, developed by Shouhang Hi-Tech, at Dunhuang, Gansu (2016) NREL

100MW Tower CSP+11 HRS TES, developed by Shouhang Hi-Tech, at Dunhuang Solar Industry Park, Dunhuang, Gansu (2018) NREL

50MW Fresnel CSP+15 HRS TES, developed by Lanzhou Dacheng Technology, at Dunhuang, Gansu (2019) NREL Focal Line Solar

50MW Beam-Down CSP+6 HRS TES, developed by China Sinogy Electric Engineering Co (CSEEC) / Xinchen Solar, at Yumen City, Jiuquan, Gansu (2021) CSTA NREL

110MW Beam-Down CSP+8 HRS TES, developed by Huidong New Energy, at 750MW Aksai Solar Base, Aksai, Gansu (2024) CSTA PV Magazine China.gov.cn GSR 2025c

100MW Fresnel CSP+8 HRS TES, developed by China National Nuclear Corporation (CNNC), at 700MW Yumen Xin’ao, Huahai Solar Base, Yumen, Gansu (2024) CSTA

100MW Tower CSP+9 HRS TES, developed by Cosin Solar, at 700MW Jinta Zhongguang Solar Base, Baishui Spring Photovoltaic Industrial Park, Jinta County, Gansu (2025) Cosin  SolarPACES breaks ground  Cosin   SolarPACES heliostats  Cosin SolarPACES round-the-clock

2×50MW Tower CSP+6 HRS shared TES, developed by China Three Gorges Renewables (CTGR), Hengji Nengmai at the 700MW Guazhou Wind-Solar Base, Guazhou, Gansu (2025) SASAC SolarPACES commissioning SolarPACES dual tower CSTA

XINJIANG

50MW Tower CSP+13 HRS TES, developed by China Energy Engineering Group (CEEC), at Hami, Xinjiang (2019) NREL SolarPACES novel heliostat deployed

100MW Fresnel CSP+8 HRS TES, developed by China Three Gorges Renewables (CTGR), China Power Engineering Consulting Group (CPECC Northwest), Dunhuang Dacheng Shengneng New Energy Technology, at 1GW Three Gorges Hami Integrated Demonstration Project, Hami, Xinjiang (2025) CSTA PV Magazine SolarPACES O&M innovations China CUC

100MW Tower CSP+8 HRS TES, developed by Xinhua Power/ Hengji Nengmai Energy Pulse New Energy Technology, at 1GW Jinghe Xinhua New Energy Project, Jinghe County, Bortala, Xinjiang (2025) SolarPACES breaks ground SolarPACES heavy lifting

100MW Tower CSP+8 HRS TES, developed by China Green Development Investment Group (CGDIG), Luneng Group, Cosin Solar (solar systems), at 1GW Fukang Luneng New Energy Project, Fukang City, Changji, Xinjiang (2025) CSP Focus  SolarPACES Cosin wins bid

100MW Tower CSP+12 HRS TES, developed by Tangshan Haitai, CPECC Northwest, Shouhang Hi-Tech (solar systems), at Tangshan Haitai’s Qiquanhu Solar Industrial Park, Turpan City, Xinjiang (2025) [Shouhang Hi-Tech] [CSTA] [SolarPACES…runs record 96 hours]

100MW Tower CSP+12 HRS TES, developed by Energy China ZPTC, Cosin at 1GW Turpan Shanshan CSP+PV Project, Toksun County, Turpan City, Xinjiang (2025) SolarPACES  Cosin

100MW Tower CSP + 8 HRS TES, developed by State Development & Investment Corp (SDIC), Shouhang Hi-Tech / NEPDI, at 1GW Guotou Ruoqiang Solar Base, Tiemulik Township, Ruoqiang County, Bazhou, Xinjiang (under construction) CSTA Shouhang 

100MW Tower CSP+TES, developed by PowerChina, SEPCO III at 1GW Ruoqiang Solar Base, Ruoqiang, Xinjiang (under construction) NREL  SolarPACES CSTA

150MW Tower CSP+8 HRS TES, developed by Energy China, Cosin Solar, at 1.5GW CEEC Hami Multi-Energy Demonstration Project, Barkol Kazakh Autonomous County, Xinjiang (under construction) Cosin Solar  CSTA  PV Magazine 

100MW Tower CSP + 8 hrs TES, developed by Shouhang Hi-Tech / China Power Construction Group Sichuan Engineering, at 1GW Jinghe Xinhua New Energy Project, Jinghe County, Bortala Mongolian Autonomous Prefecture, Xinjiang (under construction) Shouhang   CSTA

100MW Tower CSP + 8 hrs TES, developed by Xinhua Power Bozhou, EPC SunSum / Gansu Installation & Construction, at 1GW Xinhua Power Solar Project, West of Bole City, Aheqi Farm, Jinghe County, Bortala Mongolian Autonomous Prefecture, Xinjiang (under construction) SolarPACES   CSTA

TIBET

40MW Trough CSP+16 HRS TES, developed by PowerChina, EPC combined heat & power for off-grid lithium mining, at Zabuye ‘Source-Grid-Load-Storage Project’, Zhongba, Shigatse, Tibet Autonomous Region (2025) SolarPACES/CSTA PowerChina EPC 

50MW Trough CSP+6 HRS TES, developed by China General Nuclear Power Group (CGN), at 450MW CGN Xizang Damxung Wumatang Solar Thermal+PV Project, Dangxiong County, Lhasa, Tibet Autonomous Region (under construction, 2026) SolarPACES true hybrid SCMP

100MW Tower CSP+8 HRS TES, developed by Xizang Development Investment Group, EPC: PowerChina Northwest, SEPCO 1, Dongfang Boiler (heat collection), at 900MW Anduo Tushuo CSP/PV Integrated Project, Amdo County in Nagqu City, Tibet (under construction, 2026) XiZang Development and Investment Group wins Innovative Power Tech 2025… CSTA foundation… ESPLAZA heliostats delivered 

INNER MONGOLIA

100MW Trough CSP+10 HRS TES, developed by China Shipbuilding New Power (CSNP), at Urat Middle Banner, Inner Mongolia (2020) NREL SolarPACES round-the-clock SolarPACES EuroTrough record SolarPACES monthly record Royal Tech Heliosol

JILIN

100MW Tower CSP+TES, being developed by State Power Investment Corporation (SPIC), Zhongguang New Energy / PowerChina Jilin Electric Power Engineering, at the 1.4GW Lugu DC Transmission Project, Tongyu County, Baicheng, Jilin (under construction)CSTA

100MW Tower CSP+TES, being developed by PowerChina, PowerChina Jilin Electric Power Engineering, at the 1.4GW Lugu DC Transmission Project, Da’an City, Baicheng, Jilin (under construction) CSTA

HEBEI – BEIJING (Research)

1MW Tower CSP+1 HR TES, developed by the Institute of Electrical Engineering, CAS (IEE-CAS), at Badaling, Beijing (2012) NREL

15MW Fresnel CSP+15 HRS TES, developed by Huaqiang TeraSolar, at Zhangbei, Hebei (2018) NREL